Maintenance
After the successful commissioning of the Nordstream Pipeline (Norstream I) in November 2011, in which ELCON LED was entrusted with the installation of special cables and the planning and installation of electronic systems, as well as the connection of electrical measuring points and devices, the system is now in operation.
Since 2012, ELCON LED has been responsible for the maintenance and maintenance of the current systems.