Electrical engineering: This order presents the planning and assembly management with a special challenge. The brewery was not shut down during the assembly work and production continued.
| |
Project: | Brewery in Almaty Sosnadar / 3rd stage of development |
Client: | Co. Huppmann |
General Contractor: | Co. Huppmann |
Contract ELCON: | Execution of the control technology and electrical engineering |
Period of installation: | 3 months |
Special features: | The brewery was not allowed to be shut down. The business continued. |