Electrical engineering: In an old building, completely renew the entire electrical engineering in a very short time.
| Project: | Swiss embassy in Saint Petersburg | 
| Start construction: | March 2006 | 
| Construction time: | March till Juli 2006 | 
| Client: | Switzerland | 
| General contractor: | Co. Lei AG | 
| Contract ELCON: | All safety technology, lighting, switches, sockets, electronic data processing system, lock control system, etc. | 
| Period of installation: | Approx.. 3 months | 
| Special features: | In an old building, completely renew the entire electrical engineering in a very short time. | 






