Description: | Canadian embassy in Pristina |
Project volume: | Approx. 2,5 million DM |
Construction start: | July 2000 |
Construction time: | 1,5 months |
Client: | Co. Bautech GmbH |
General contractor: | Co. Bautech GmbH |
ELCON contract: | Installation of the telephone system and the EDP system. |
Special features: | Since all safety regulations had to be complied with, which did not disturb the operation of the embassy, |
Electrical engineering: In 2000, ELCON installed the computer system and electronic building equipment for the Canadian Embassy in Pristina. Due to the strict safety precautions, the assembly work must take place at exceptional times.