| |
Project: | German embassy in Riga |
Description: | The embassy is to be housed in an existing building, which is a listed building. |
Project volume: | 9 million DM |
Construction start: | August 1996 |
Construction time: | 12 months |
Client: | German Foreign Ministry |
General contractor: | MBN joint-stock company for construction, Berlin |
ELCON contract: | Renewal of all electrical equipment low voltage distributions, emergency power supply, interior lighting, special luminaires, fire alarm systems, communication systems, safety system, special systems, roof heating, lightning protection and outdoor systems. |
Period of installation: | 10 months |
Special features: | The special interior design - beautiful old stucco ceilings, cladding, etc. require precise work. |
Electrical engineering: The German Foreign Ministry established a German Embassy in Riga in 1996. ELCON planned the complete electrical equipment for the beautiful listed building. The old stucco ceilings and cladding are to be preserved and restored, which requires a particularly precise execution of the works. Within 12 months, the low voltage distribution, emergency power supply, lighting, fire and lightning protection systems, as well as communication systems, safety systems, roof heating, etc. are planned and installed with the necessary sensitivity.