Project: | New Faculty of Economics in Pristina |
Description: | Reinstall or put into operation the complete electrical engineering installation. |
Construction start: | June 2000 |
Construction time: | 4 months |
Client: | OSCE (Organization for Security and Co-operation in Europe) |
General contractor: | Co. Bautech GmbH |
ELCON contract: | Check old technology. Take over still usable technology, otherwise reinstall. |
Special features: | Very short execution period in an unstable country. |
Electrical engineering: In 2000, ELCON installed or commissioned all electrical engineering of the building for the new Faculty of Economics in Pristina on behalf of the OSCE. Some of the old installations can be used further. However, the entire computer installation and communication technology must be renewed.